Sr Construction Manager, Data Center Construction
Company: Amazon Data Services, Inc.
Location: Berwick
Posted on: July 17, 2025
|
|
Job Description:
AWS Infrastructure Services owns the design, planning, delivery,
and operation of all AWS global infrastructure. In other words,
we’re the people who keep the cloud running. We support all AWS
data centers and all of the servers, storage, networking, power,
and cooling equipment that ensure our customers have continual
access to the innovation they rely on. We work on the most
challenging problems, with thousands of variables impacting the
supply chain — and we’re looking for talented people who want to
help. You’ll join a diverse team of software, hardware, and network
engineers, supply chain specialists, security experts, operations
managers, and other vital roles. You’ll collaborate with people
across AWS to help us deliver the highest standards for safety and
security while providing seemingly infinite capacity at the lowest
possible cost for our customers. And you’ll experience an inclusive
culture that welcomes bold ideas and empowers you to own them to
completion. As a Data Center Senior Construction Manager you will
be a part of a creative, diverse team tasked with solving
fascinating problems constructing Amazon Data Centers. Our data
centers are industry-leading examples of energy efficient,
cost-effective designs. You will work alongside partner teams such
as Operations, Networking, Controls, Security, and Commissioning to
build Data Centers that directly support our Customers. As our Data
Center Senior Construction Manager, you will build some of the most
interesting electrical and mechanical systems in the world. You
will be on the construction site daily interacting with the
construction trades, as Amazon’s owner’s representative and be
directly responsible for driving cost, schedule, and quality while
managing construction vendors and contractors building data
centers. At Amazon, we are all Owners and leverage unique
opportunities presented to us by owning everything from the design
review to construction bidding to construction execution and final
hand-off to our customers. We are a diverse, upbeat, creative, team
of engineers and managers working on a daily basis to develop
innovative data centers for our Customers. Able to value engineer,
and find creative and innovative solutions to reduce costs and
duration with no impact on quality and reliability. * Experience
with design or construction of data centers, critical
infrastructure, or large-scale MEP plants. * Experience with
systems, controls, commissioning, power management, and technical
operations of data centers critical infrastructure, or large-scale
MEP plants. * Knowledge of governing building codes and
regulations, including Life Safety, BOCA, NFPA, NEC, and OSHA. *
Certified as a Professional Engineer (PE), LEED, or Certified
Construction Manager (CCM). * Experience with *managing
construction of* complex electrical engineering systems including
large scale power distribution/generation gear and mechanical
engineering systems including cooling systems. * Meet or exceed
Amazon’s leadership principles requirements for this role. * Meet
or exceed Amazon’s functional and technical depth and complexity
for this role. * Able to specify and document performance and
equipment requirements, create and communicate conceptual designs,
and create and maintain project documentation. Key job
responsibilities The Data Center Senior Construction Manager will
be responsible for construction project management and oversight of
construction related activities as they relate to new builds or
general capital projects which includes the ownership of the
project scope, quality, schedule, and budget. Some of the typical
daily tasks of the Construction Manager: - Direct interface with
construction general contractors during the bidding, award,
execution, and project closeout/punch list phases. - Conduct
negotiations with general contractors and evaluate bids/proposals
with detail and accuracy. - Create construction project scope and
request for proposals. - Financial analysis of construction. -
Construction project management for specific initiatives aimed at
increasing the resiliency of our data centers. - Constructability
reviews of electrical and mechanical designs associated with the
construction of new data centers or optimization of existing data
centers. - Construction document management including submittal
review, RFI’s, change orders, and invoicing. - Construction project
quality control. - Record and report key construction metrics to
team members and management. - Drive teams to perform
troubleshooting and root-cause failure analysis associated with
equipment failures. - Be a leader within the group as well as
within internal and external teams that support the data center. -
Able to read and interpret construction specifications and drawings
for all disciplines. - Define data center system-level
architecture, specify/document performance and equipment
requirements, create/communicate conceptual designs, and
create/maintain project documentation. - Experience with large
scale technical operations or large-scale compute farms. -
Knowledge of building codes and regulations including Life Safety,
BOCA, NFPA, NEC, and OSHA. - Experience in controls and
commissioning of large scale projects. - Experience with power
management and power monitoring systems. - Certifications such as
Professional Engineer (PE), LEED, and/or Certified Construction
Manager (CCM) - Meets/exceeds Amazon’s leadership principles
requirements for this role - Meets/exceeds Amazon’s
functional/technical depth and complexity for this role A day in
the life Why AWS Amazon Web Services (AWS) is the world’s most
comprehensive and broadly adopted cloud platform. We pioneered
cloud computing and never stopped innovating — that’s why customers
from the most successful startups to Global 500 companies trust our
robust suite of products and services to power their businesses.
*Diverse Experiences* Amazon values diverse experiences. Even if
you do not meet all of the preferred qualifications and skills
listed in the job description, we encourage candidates to apply. If
your career is just starting, hasn’t followed a traditional path,
or includes alternative experiences, don’t let it stop you from
applying. *Work/Life Balance* We value work-life harmony. Achieving
success at work should never come at the expense of sacrifices at
home, which is why we strive for flexibility as part of our working
culture. When we feel supported in the workplace and at home,
there’s nothing we can’t achieve in the cloud. *Inclusive Team
Culture* Here at AWS, it’s in our nature to learn and be curious.
Our employee-led affinity groups foster a culture of inclusion that
empower us to be proud of our differences. Ongoing events and
learning experiences, including our Conversations on Race and
Ethnicity (CORE) and AmazeCon (gender diversity) conferences,
inspire us to never stop embracing our uniqueness. *Mentorship and
Career Growth* We’re continuously raising our performance bar as we
strive to become Earth’s Best Employer. That’s why you’ll find
endless knowledge-sharing, mentorship and other career-advancing
resources here to help you develop into a better-rounded
professional. About the team AWS Infrastructure Services owns the
design, planning, delivery, and operation of all AWS global
infrastructure. In other words, we’re the people who keep the cloud
running. We support all AWS data centers and all of the servers,
storage, networking, power, and cooling equipment that ensure our
customers have continual access to the innovation they rely on. We
work on the most challenging problems, with thousands of variables
impacting the supply chain — and we’re looking for talented people
who want to help. You’ll join a diverse team of software, hardware,
and network engineers, supply chain specialists, security experts,
operations managers, and other vital roles. You’ll collaborate with
people across AWS to help us deliver the highest standards for
safety and security while providing seemingly infinite capacity at
the lowest possible cost for our customers. And you’ll experience
an inclusive culture that welcomes bold ideas and empowers you to
own them to completion. BASIC QUALIFICATIONS Bachelor’s degree in
Mechanical Engineering, Electrical Engineering, Construction
Management or an equivalent engineering science Degree 7 or 11
total years of related construction management experience *in lieu*
of a degree. 6 years of experience in *construction management* of
large, complex projects involving large-scale mechanical,
electrical and plumbing (MEP) plants. 6 years of *general
contractor and vendor management experience* (request for
proposals, bidding, change orders, quality control, RFI/submittal
tracking) associated with construction and project execution.
Experience working with cross function teams to deliver complex
construction projects. PREFERRED QUALIFICATIONS * Understand data
center system-level architecture and electrical engineering
principles, including switch gear, UPS, transformers, circuit
breakers, breaker coordination studies, and switchgear sequence of
operation * Understand data center system-level architecture and
mechanical engineering principles for cooling systems. * Able to
communicate clearly and use data to justify conclusions. * Able to
read and interpret construction specifications and drawings for all
disciplines. Amazon is an equal opportunity employer and does not
discriminate on the basis of protected veteran status, disability,
or other legally protected status. Our inclusive culture empowers
Amazonians to deliver the best results for our customers. If you
have a disability and need a workplace accommodation or adjustment
during the application and hiring process, including support for
the interview or onboarding process, please visit
https://amazon.jobs/content/en/how-we-hire/accommodations for more
information. If the country/region you’re applying in isn’t listed,
please contact your Recruiting Partner.
Keywords: Amazon Data Services, Inc., New Brunswick , Sr Construction Manager, Data Center Construction, Engineering , Berwick, New Jersey